Contact Betsy DeMann

Send a message directly to the publisher

Should You Wait Until Spring? What I Tell Park City Homeowners in October

Back to Articles
Share:
  • Copied!

Every October I get the same question. The leaves turn, someone hits their limit with their kitchen — usually there’s a specific grievance, a drawer that hasn’t closed right since 2011—and they ask whether to wait until spring.

Almost always, no. Winter is one of the best times to remodel up here, and October is when you set it up.

The weather isn’t the problem you think it is

Interior work doesn’t care what’s happening outside. Kitchens, bathrooms, basements, fireplaces, built-ins — all of it happens behind a closed door with the heat running. Snow doesn’t slow down a cabinet install or a tile layout.

Weather governs exterior work: roofing, siding, decks, hardscape. At our elevation, that window is short, and every contractor in town fights over the same few months. Which is exactly why you want your interior project in January rather than crammed into an already packed summer.

The other thing I hear is that builders go quiet after the holidays. The good ones don’t. Keeping a crew working year-round isn’t generosity — it’s how you hold onto people whose kids go to school with your kids, and who’ll still be answering their phone in this valley in ten years. Same framer, same electrician, same tile guy, year after year. That continuity is most of what you’re paying for.

Ghigau Construction, LLC driveway pavement

Submitted photo

Ghigau Construction, LLC driveway pavement

Submitted photo

Why the call happens now

Here’s the part homeowners underestimate. The work before the work — drawings, permits, budget, selections — routinely takes six to ten weeks. Cabinets and specialty fixtures can take even longer.

So a January start isn’t a January decision. It’s an October one. Call me in December hoping to be underway by New Year’s, and the honest answer is usually March or April.

Reach out this month, and you get the start date you want, you order materials before winter lead times stretch, and you sit with samples in your own light instead of picking a finish at 9 p.m. Call in February, and you’re calling about summer — and by then, summer might already be spoken for. Finish in early spring, and you won’t be living in plastic come July.

The honest part

A winter job isn’t the same as a June job. None of the differences are dealbreakers — they’re just things we plan for instead of discover.

Snow and access. We’ll need a plowed path for the crew and materials, and a dumpster spot that won’t be buried by February. In Old Town, that takes some thought — so we walk the property in the fall and have it settled before the first real storm.

A colder house for a few days. Demo and delivery days mean open doors, and your heating bill will notice. We seal off the work area and keep the rest of the house livable while we’re in there.

Living in it. Everyone’s indoors more in winter, so the same mess feels bigger. Also fixable. We set up a temporary kitchen somewhere you’ll actually use it, and I tell every client to buy the good coffee maker. I’m serious. Morale is a line item.

And if you rent during ski season, tell me early — we’ll build the schedule around your booking calendar.

Ghigau Construction, LLC interior remodel

Submitted photo

Ghigau Construction, LLC interior remodel

Submitted photo

Not ready to build

You don’t have to commit to anything this fall. Get measured, get drawings, get a number you trust. If a project isn’t right, I’ll say so — I’ve talked people out of more than one — and I’d much rather do that in October than halfway through demo.

My advice doesn’t change: start the conversation early, make the decisions slowly. The best remodels I’ve been part of weren’t the fastest. They’re the ones that started with a phone call in the fall.

Any content, resident submissions, guest columns, advertisements, and advertorials are not necessarily endorsed by or represent the views of Best Version Media LLC (BVM) or any municipality, homeowners associations, businesses, or organizations that this publication serves. BVM is not responsible for the reliability, suitability, or timeliness of any content submitted, inclusive of materials generated or composed through artificial intelligence (AI). All content submitted is done so at the sole discretion of the submitting party.

Meet the Publisher

Contact Us