If you’ve ever tried to research remodeling costs online, you’ve run into the same frustrating wall: national averages that have nothing to do with Northern Virginia. What costs $40,000 in Kansas costs $75,000 here. Why? NOVA labor runs 35–40% above national averages, permits are multi-layered across Fairfax, Arlington, Loudoun, and Prince William counties, and material costs carry a DC-metro premium. Here’s what projects actually cost in this market right now.
Kitchen Remodels
The kitchen drives the highest ROI in NOVA — and the widest price range. Here’s the 2026 breakdown:
| Level | Price Range |
| Entry-Level (cosmetic refresh) | $28,000–$45,000 |
| Mid-Range (full remodel) | $55,000–$95,000 |
| High-End / Luxury | $110,000–$180,000+ |
Mid-range typically includes semi-custom cabinetry, quartz counters, tile backsplash, hardwood floors, and quality appliances. Luxury builds add Wolf/Sub-Zero, custom millwork, and heated floors.
| Watch Out
Moving walls or plumbing adds $8K–$25K+. Always get a structural assessment first. |
Bathroom Remodels
The most expensive room per square foot — dense plumbing, waterproofing, and tight working conditions drive costs high.
| Type | Price Range |
| Half Bath Update | $8,000–$18,000 |
| Full Primary Bath | $28,000–$65,000 |
| Spa-Level Master Bath | $75,000–$140,000+ |
Tile labor: $12–$22/sq ft · Frameless glass: $2,200–$5,500 · Waterproofing: $1,500–$3,500
Home Additions
Whether you’re adding a primary suite, family room, or second story — square footage is the starting point.
| Addition Type | Price Range |
| Single-story (mid-range) | $310–$420/sq ft |
| Single-story (high-end) | $420–$580+/sq ft |
| Second-story | $350–$550/sq ft |
| Basement finish | $80–$130/sq ft |
| Garage conversion | $85–$160/sq ft |
| Good News
Primary suite additions in NOVA recoup 65–80% at resale. In McLean, Vienna & Great Falls, often 80%+. |
ROI AT A GLANCE
Where Does Your Dollar Go Furthest?
| Project | Price Range |
| Minor Kitchen Refresh | 75–92% ROI |
| Bathroom Addition | 70–85% ROI |
| Primary Suite Addition | 65–80% ROI |
| Deck / Outdoor Living | 65–75% ROI |
| Basement Finish | 55–70% ROI |
PERMITS MATTER
Never skip permits. Unpermitted work voids insurance, blocks home sales, and requires costly rework. Budget $600–$2,500 for kitchen/bath permits and $2,000–$9,000+ for additions depending on your county (Fairfax, Arlington, Loudoun, or Prince William). HOA residents add 30–90 days for architectural review.
BEFORE YOU SIGN ANYTHING
5 Questions to Ask Every Contractor
- Are you licensed with DPOR Virginia?
- Do you carry general liability AND workers’ comp?
- Will you pull all required permits?
- Is this quote truly all-in — materials, labor, permits, cleanup?
- What is your change order and cost overrun policy?
Call 571-292-1800 or go to www.bgconstructionllc.com
10438 Business Center Ct, Manassas
Any content, resident submissions, guest columns, advertisements, and advertorials are not necessarily endorsed by or represent the views of Best Version Media LLC (BVM) or any municipality, homeowners associations, businesses, or organizations that this publication serves. BVM is not responsible for the reliability, suitability, or timeliness of any content submitted, inclusive of materials generated or composed through artificial intelligence (AI). All content submitted is done so at the sole discretion of the submitting party.