Contact Eric Mugavero

Send a message directly to the publisher

The Real Cost of the Cheapest Bid

Back to Articles
Share:
  • Copied!

Say you’re planning a kitchen remodel, major renovation or addition and you get three contractors to quote it. All three walk the same house, and all three hand you a different price. Most people circle the lowest one and move on. I understand why. It’s your money, and when one bid comes in ten or twenty grand under the rest, that feels like you got lucky. But I’ve been building and fixing homes here for years, and the cheap bid almost never turns into the cheap job. It’s just the cheapest thing anybody wrote down.

When two prices are miles apart, it’s usually not that one person is a saint and the other is out to rob you. They’re pricing different work. The low bid tends to skip things. Maybe it doesn’t cover demo, or hauling away the mess, or the permit fees, or that wall you figured was part of the deal. Nobody tells you what got left off. You find out when the bill lands.

A lot of the time the gap is the materials. A price drops in a hurry once you trade real wood for particle board, or put in the cheapest faucet instead of the one you picked, or hand the wiring to some kid with a drill instead of a licensed electrician. None of that shows up on a one-page quote. It shows up two winters later, when a cabinet door won’t shut and an outlet quits.

Porch-ERS Better Homes

(Submitted by Chet Alvarez)

Here’s the thing I wish people asked about first. Is the contractor certified and insured? In New Jersey, a registered home improvement contractor and builder carries liability coverage, workman’s compensation, bonding and pulls permits that an inspector actually reviews with the architectural prints. When somebody quotes you a rock-bottom cash number and there’s no paperwork behind it, you aren’t saving anything. You’ve just agreed to eat every risk yourself, right down to what happens if one of employees or subs gets hurt in your house.

The bill for a cheap bid usually shows up as change orders. Work starts, the shortcuts turn into headaches, and the price you thought was a steal climbs right past what the higher bidder wanted. Now your kitchen’s torn apart and you’re in too deep to walk. I’ve been called in to clean up plenty of these, and fixing somebody else’s mess always runs more than doing it right the first time.

Deck-ERS Better Homes

(Submitted by Chet Alvarez)

Take your time with the bids. Find out what’s in each one and what got left out. Ask to see the license and the insurance. Get the scope in writing and know the payment schedule before anyone swings a hammer. A contractor worth hiring won’t flinch at any of that. A fair bid is easy to stand behind.

The cheapest price was never really the point. What you want is a house built right, without the budget blowing up or some surprise halfway through. If you’d like an itemized number with information to back it up, give me a call. 

732-546-0344

calvarez@ers-na.com

Instagram: ersbetterhomes
Facebook: ERS Better Homes

Any content, resident submissions, guest columns, advertisements, and advertorials are not necessarily endorsed by or represent the views of Best Version Media LLC (BVM) or any municipality, homeowners associations, businesses, or organizations that this publication serves. BVM is not responsible for the reliability, suitability, or timeliness of any content submitted, inclusive of materials generated or composed through artificial intelligence (AI). All content submitted is done so at the sole discretion of the submitting party.

Meet the Publisher

Contact Us